Independent waste-to-energy journalism

Home » Plants » Hinwil
Waste-to-energy plant ·

Hinwil

Hinwil

Operator: Zweckverband KEZO · Operating

Permitted capacity
255.5 kt/a
Incineration lines
3
Commissioned
1977
Energy recovery
CHP

The KEZO (Kehrichtverwertungsanlage Zürcher Oberland) in Hinwil is one of Switzerland’s largest and most technologically advanced waste-to-energy plants, operated by the Zweckverband KEZO.

With three incineration lines processing waste from the Zürich Oberland and beyond, the facility delivers significant electricity to the national grid and exports thermal energy to district heating customers. KEZO is also notable for being the host site of the world’s first commercial direct air capture plant (Climeworks), powered by the residual heat of the incineration process.

Technical data
Hourly capacity WtE Monitor+Available with WtE Monitor+
Waste calorific value WtE Monitor+Available with WtE Monitor+
FeedstockMunicipal and commercial waste
Accepted waste types (EWC codes) WtE Monitor+Available with WtE Monitor+
Electricity generated WtE Monitor+Available with WtE Monitor+
District heat use WtE Monitor+Available with WtE Monitor+
Ownership WtE Monitor+Available with WtE Monitor+
Commissioning by line1977 (Line 1); 1990 (Line 2); 2010 (Line 3)
Modernisation / expansion WtE Monitor+Available with WtE Monitor+
Projects in progressHost site of world's first commercial direct air capture plant (Climeworks), powered by residual heat

Coverage of this plant

Location

Nearby plants

AI search

Ask WtE Monitor

Answers come only from WtE Monitor articles and plant data, with sources. Ask in any language.

Your question is processed by Anthropic to generate the answer. Please do not enter personal data. Privacy policy

3 questions a month with a free subscription, unlimited with WtE Monitor+. Subscribe free · Get WtE Monitor+