- Permitted capacity
- 480 kt/a
- Incineration lines
- 2
- Commissioned
- 2024
- Energy recovery
- CHP
Slough Multifuel is a two-line energy-from-waste plant on the Slough Trading Estate in Berkshire, built on the site of the former Slough Heat and Power CHP station.
It was developed by SSE Thermal and Copenhagen Infrastructure Partners as a 50:50 joint venture, built under a turnkey contract by Hitachi Zosen Inova (now Kanadevia Inova), which also operates it under a 25-year O&M contract, and received its completion certificate on 22 August 2024 after 45 months of construction.
The plant is designed for about 480,000 tonnes of waste-derived fuel from municipal, commercial and industrial waste and waste wood a year, generates around 55-60 MW of electricity and supplies low-pressure steam to a neighbouring confectionery factory. In 2025 the owners were reported to be seeking a buyer for the facility.
| Firing system | Grate |
|---|---|
| Firing system details | WtE Monitor+Available with WtE Monitor+ |
| Thermal input | 183.4 MWth |
| Feedstock | waste-derived fuel (RDF) from residual municipal solid waste, commercial and industrial waste and waste wood |
| Accepted waste types (EWC codes) | WtE Monitor+Available with WtE Monitor+ |
| Steam parameters | WtE Monitor+Available with WtE Monitor+ |
| Electrical output | WtE Monitor+Available with WtE Monitor+ |
| Electricity generated | WtE Monitor+Available with WtE Monitor+ |
| District heat output | WtE Monitor+Available with WtE Monitor+ |
| Heat delivered | WtE Monitor+Available with WtE Monitor+ |
| District heat use | WtE Monitor+Available with WtE Monitor+ |
| Process steam delivered | WtE Monitor+Available with WtE Monitor+ |
| Operating hours | 8,000 h/a |
| Flue gas cleaning | WtE Monitor+Available with WtE Monitor+ |
| Technology suppliers | WtE Monitor+Available with WtE Monitor+ |
| Designer / EPC contractor | WtE Monitor+Available with WtE Monitor+ |
| Ownership | WtE Monitor+Available with WtE Monitor+ |
| Commissioning by line | 2024 (Lines 1-2; completion certificate 22 August 2024) |
| Modernisation / expansion | WtE Monitor+Available with WtE Monitor+ |
| Projects in progress | Development consent order (Slough Multifuel Extension) granted November 2023 to raise gross electrical output from 50 to about 60 MWe; environmental permit varied December 2023 to allow co-incineration of hazardous waste wood and in February 2025 (EPR/KP3702MY/V003) to raise fuel throughput to 525,000 t/a; sale process by SSE and CIP reported October 2025 |
| Address | 342 Edinburgh Avenue, Slough Trading Estate, Slough SL1 4TU |
Location
Open in Google Maps · 51.5239, -0.6269
Nearby plants
- Slough (Lakeside)9 km
- Shepperton18 km
- Sutton (Beddington)37 km
- London-Lewisham (SELCHP)40 km
Sources
20 sources for this profile. The list is part of WtE Monitor+
Ask WtE Monitor
Answers come only from WtE Monitor articles and plant data, with sources. Ask in any language.
Your question is processed by Anthropic to generate the answer. Please do not enter personal data. Privacy policy
3 questions a month with a free subscription, unlimited with WtE Monitor+. Subscribe free · Get WtE Monitor+