Waste-to-energy plant ·

Maidstone

Waste to Energy plant Kent
Source: Tom – stock.adobe.com

Operator: FCC Environment · Operating · Data verified 22.10.2026

Permitted capacity
560 kt/a
Incineration lines
3
Commissioned
2008
Energy recovery
Electricity

The Allington Energy-from-Waste plant is in the former Allington Quarry on the north-western edge of Maidstone. It is operated by Kent Enviropower Ltd, a subsidiary of FCC Environment. Furthermore, it is one of the few UK waste incinerators built with fluidised-bed technology.

Its three Rowitec circulating fluidised bed lines, supplied by Lentjes, are permitted for 560,000 tonnes of residual household and commercial waste a year. These lines drive a single turbine of around 42.5 MW. Construction began in 2004. However, refractory failures and a turbine fault delayed commercial takeover until December 2008. The plant serves a 25-year contract with Kent County Council. A fourth line that would have raised capacity to around 800,000 tonnes was consulted on in 2019. That proposal was withdrawn in 2022.

Technical data
Firing systemFluidised bed
Firing system details WtE Monitor+Available with WtE Monitor+
Thermal input161.4 MWth
Hourly capacity WtE Monitor+Available with WtE Monitor+
Waste calorific value WtE Monitor+Available with WtE Monitor+
Feedstockpre-processed residual household and commercial waste
Accepted waste types (EWC codes) WtE Monitor+Available with WtE Monitor+
Electrical output WtE Monitor+Available with WtE Monitor+
Flue gas cleaning WtE Monitor+Available with WtE Monitor+
Technology suppliers WtE Monitor+Available with WtE Monitor+
Designer / EPC contractor WtE Monitor+Available with WtE Monitor+
Ownership WtE Monitor+Available with WtE Monitor+
Commissioning by line2004 construction start; 2006 first waste commissioning; 2008 (commercial takeover of Lines 1–3 after endurance test, December 2008)
Modernisation / expansion WtE Monitor+Available with WtE Monitor+
Projects in progressproposed fourth line (+300,000 t/a, to c. 800,000 t/a) consulted on in 2019 as a nationally significant infrastructure project; withdrawn by FCC in November 2022
AddressAllington Quarry, Laverstoke Road, Allington, Maidstone, Kent ME16 0LE

Location

Nearby plants

Sources

7 sources for this profile. The list is part of WtE Monitor+

AI search

Ask WtE Monitor

Answers come only from WtE Monitor articles and plant data, with sources. Ask in any language.

Your question is processed by Anthropic to generate the answer. Please do not enter personal data. Privacy policy

3 questions a month with a free subscription, unlimited with WtE Monitor+. Subscribe free · Get WtE Monitor+