Waste-to-energy plant ·

London-Edmonton (ERF)

London Edmonton ERF
Source London Heat and Power, via Youtube

Operator: LondonEnergy Ltd · Under construction · Data verified 22.10.2026

Permitted capacity
700 kt/a
Incineration lines
2
Commissioned
2027
Energy recovery
CHP

The Edmonton Energy Recovery Facility (ERF) is being built by the North London Waste Authority (NLWA) at the Edmonton EcoPark in the London Borough of Enfield. It is the centrepiece of the North London Heat and Power Project. The ERF replaces the Energy-from-Waste plant that has operated on the site since 1971.

The two-line moving-grate plant was consented by a Development Consent Order in February 2017 for up to 700,000 tonnes of waste a year. It is built by Acciona and will generate up to 78 MW of electricity with a Doosan Skoda Power turbine. Furthermore, heat will be supplied to district heating networks, including Energetik’s Meridian Water network.

In August 2026 construction was 59 per cent complete and the turbine and generator were installed in September 2026. Completion has slipped from 2025 to 2027 while the contract cost rose from GBP 1.2bn to about GBP 1.5bn.

Technical data
Firing systemGrate
Firing system details WtE Monitor+Available with WtE Monitor+
Feedstockresidual municipal solid waste from the seven NLWA boroughs, commercial waste
Electrical output WtE Monitor+Available with WtE Monitor+
District heat use WtE Monitor+Available with WtE Monitor+
Flue gas cleaning WtE Monitor+Available with WtE Monitor+
Technology suppliers WtE Monitor+Available with WtE Monitor+
Designer / EPC contractor WtE Monitor+Available with WtE Monitor+
Ownership WtE Monitor+Available with WtE Monitor+
Commissioning by line2027 (planned, Lines 1-2 of up to 350,000 t/a each; original target 2025)
Projects in progressERF under construction (59% complete August 2026; turbine and generator installed September 2026); completion delayed from 2025 to 2027, contract cost up from GBP 1.2bn to GBP 1.5bn (2024); heat network connections (Meridian Water, Haringey) in development; existing 1971 plant to be closed after the ERF starts up
AddressEdmonton EcoPark, Advent Way, London N18 3AG

Coverage of this plant

Location

Nearby plants

Sources

12 sources for this profile. The list is part of WtE Monitor+

AI search

Ask WtE Monitor

Answers come only from WtE Monitor articles and plant data, with sources. Ask in any language.

Your question is processed by Anthropic to generate the answer. Please do not enter personal data. Privacy policy

3 questions a month with a free subscription, unlimited with WtE Monitor+. Subscribe free · Get WtE Monitor+