Operator: Evero Energy · Closed · Data verified 22.10.2026

Permitted capacity
240 kt/a
Incineration lines
1
Commissioned
2020
Energy recovery
Electricity

Energy Works Hull on Cleveland Street, on the banks of the River Hull, is a GBP 200m fluidised-bed gasification plant. It is designed to convert about 240,000 tonnes a year of refuse-derived fuel into around 25 MW of electricity.

Developed by Spencer Group and owned by Energy Works (Hull) Ltd, part of Evero Energy (formerly Bioenergy Infrastructure Group), it was built from 2015 by M+W Group with an Outotec gasifier and a Sutco pre-treatment plant. However, the EPC contract was terminated in March 2019 after commissioning failures. This led to High Court litigation in which the owner was awarded over GBP 117m against M+W.

The plant never processed waste at the volume needed to be viable (30,941 tonnes in 2023). As a result, it was mothballed by Evero in August 2024, with a sale under consideration. In September 2026 it was reported that it could return to operation as part of a district heating scheme.

Technical data
Firing systemGasification
Firing system details WtE Monitor+Available with WtE Monitor+
Thermal input100 MWth
Waste calorific value WtE Monitor+Available with WtE Monitor+
Feedstockrefuse-derived fuel (RDF) prepared on site from municipal and commercial/industrial waste; waste wood
Electrical output WtE Monitor+Available with WtE Monitor+
Flue gas cleaning WtE Monitor+Available with WtE Monitor+
Technology suppliers WtE Monitor+Available with WtE Monitor+
Designer / EPC contractor WtE Monitor+Available with WtE Monitor+
Ownership WtE Monitor+Available with WtE Monitor+
Commissioning by line2018 (hot commissioning from April 2018); 2020/2021 (operational after termination of EPC contractor, completion by owner); August 2024 mothballed
Projects in progressMothballed since August 2024 (extended non-operational maintenance period), owner Evero seeking a buyer; September 2026 report that the plant could return to operation as part of a Hull district heating scheme; ongoing litigation: MW High Tech Projects' claim of over GBP 165m against Outotec (trial scheduled 2025)
AddressEnergy Works, Cleveland Street, Hull, HU8 8AD

Location

Nearby plants

Sources

10 sources for this profile. The list is part of WtE Monitor+

AI search

Ask WtE Monitor

Answers come only from WtE Monitor articles and plant data, with sources. Ask in any language.

Your question is processed by Anthropic to generate the answer. Please do not enter personal data. Privacy policy

3 questions a month with a free subscription, unlimited with WtE Monitor+. Subscribe free · Get WtE Monitor+